During a commissioning inspection, a newly installed AHU was not meeting design specifications.
Project Proposal
Our commissioning report outlines a number of small issues for the installing contractor to repair.
Project Implementation
Guided contractor with detailed scope of work to resolve deficiencies in a timely manner.
Measurement and Verification
Airflow and temperature measurements met criteria from initial design.
Validating the Promise
Business owner reported increased tenant comfort.